GROWTH | Condo Turnover Punchlist

It's an exciting moment when you get a call from your Property Account Manager telling you that the condo you've just purchased is ready for turnover! After paying several 5 digit monthly payments over a course of several years, you  are about to see what you've bled and slaved for the past years - in the flesh. This an overwhelming event, more so if it would be your first time to accept a condo turnover.


Surrounded by newly painted walls, wrapped-in-plastic toilet and kitchen sinks and overly helpful turnover managers, final turnover inspection is a fairy tale affair, until the pixie dust fades and the minor but unpleasant "oversights" start showing their true colors.

Doorbells getting stuck, non-working mechanical vents and hollow-under-the-tile flooring are some of the "gremlins" we've avoided by following  this simple yet effective punch list we use before we accept a condo we've just recently purchased. It has done wonders and helped both buyer and seller meet mutual expectations.




Checklist for unit inspection



Project name                : _____________________________
Location                       : _____________________________
Address                       : _____________________________
Unit number                  : _____________________________
Date of inspection         : _____________________________

Things to bring:
o     Electrician | Carpenter | Home expert
o     leveling tool
o     camera
o     steel measuring tape
o     pencil
o     sample floor plan (if available)
o     gravity weight measure
o    


electric tester

1.      Exterior and Main Door:
a.       main water gate valve                         o acceptable o not acceptable | remarks _______________
b.      main circuit breaker                           o acceptable o not acceptable | remarks _______________
c.       main light switch and doorbell             o acceptable o not acceptable | remarks _______________
d.      knob, lock  and peephole                  o acceptable o not acceptable | remarks _______________
e.       alignment    (frame, fit)                       o acceptable o not acceptable | remarks _______________    
f.        door finish (varnish, color)      o acceptable o not acceptable | remarks _______________          
2.      toilet & bath:
a.       switch /outlets                                    o acceptable o not acceptable | remarks _______________
b.      lavatory and faucet                 o acceptable o not acceptable | remarks _______________
c.       toilet, tank fitting, seat cover               o acceptable o not acceptable | remarks _______________
d.      paper holder, soap holder                  o acceptable o not acceptable | remarks _______________
e.       shower and faucets                o acceptable o not acceptable | remarks _______________
f.        leaks                                                 o acceptable o not acceptable | remarks _______________
g.       mechanical vents                                o acceptable o not acceptable | remarks _______________
h.       Bathroom Mirror                               o acceptable o not acceptable | remarks _______________
3.      kitchen:
a.       switch / outlets                                   o acceptable o not acceptable | remarks _______________
b.      kitchen sink / grease trap / finish         o acceptable o not acceptable | remarks _______________
c.       faucet leaks and drain                        o acceptable o not acceptable | remarks _______________
d.      kitchen tiles finish : grout / drips          o acceptable o not acceptable | remarks _______________
e.       measurements for ref and range          o acceptable o not acceptable | remarks _______________          
f.        modular cabinet and vent                   o acceptable o not acceptable | remarks _______________
4.      living room / flooring:
a.       outlets (TV, phone, electrical)            o acceptable o not acceptable | remarks _______________
b.      if floor is level                                    o acceptable o not acceptable | remarks _______________
c.       cracked tiles                                      o acceptable o not acceptable | remarks _______________
d.      alignment and finish                o acceptable o not acceptable | remarks _______________
e.       check for hollow flooring                    o acceptable o not acceptable | remarks _______________
5.      windows and sliding door (for balcony unit):
a.       sealant                                               o acceptable o not acceptable | remarks _______________          
b.      sliding / hinges                                    o acceptable o not acceptable | remarks _______________
c.       glass – cracks / scratches                   o acceptable o not acceptable | remarks _______________
d.      lock and handles –bent, scratch          o acceptable o not acceptable | remarks _______________
6.      walls:
a.       smoothness                            o acceptable o not acceptable | remarks _______________
b.      alignment                                           o acceptable o not acceptable | remarks _______________
c.       cracks / repairs                                  o acceptable o not acceptable | remarks _______________
7.      ceiling:
a.       cracks                                               o acceptable o not acceptable | remarks _______________
b.      leaks                                                 o acceptable o not acceptable | remarks _______________
c.       cleanliness                                         o acceptable o not acceptable | remarks _______________
8.      electrical:
a.       if all outlets are working                     o acceptable o not acceptable | remarks _______________
b.      wall sockets and brackets                  o acceptable o not acceptable | remarks _______________          
c.       currents are stable @ 220v (tester)  o acceptable o not acceptable | remarks _______________
9.      plumbing:
a.       drainage                                            o acceptable o not acceptable | remarks _______________
b.      leaks                                                 o acceptable o not acceptable | remarks _______________
c.       provision for hot and cold water         o acceptable o not acceptable | remarks _______________
10.  cabinet:                  
a.       hinges and handles                 o acceptable o not acceptable | remarks _______________
b.      sturdy hanger                                     o acceptable o not acceptable | remarks _______________
c.       fit and level shelves                o acceptable o not acceptable | remarks _______________
d.      assembly and finish                o acceptable o not acceptable | remarks _______________
11.  overall paint:
a.       smoothness                            o acceptable o not acceptable | remarks _______________
b.      uniformity                                          o acceptable o not acceptable | remarks _______________
c.       durability                                           o acceptable o not acceptable | remarks _______________
d.      drips / water marks                o acceptable o not acceptable | remarks _______________
12.  Miscellaneous
a.       fire sprinklers / alarms
b.      emergency outlets                              o acceptable o not acceptable | remarks _______________
c.       aircon outlet / drain / opening             o acceptable o not acceptable | remarks _______________
d.      PTAC Aircon                                   o acceptable o not acceptable | remarks _______________

NOTES:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

7 comments:

  1. Beautiful photo of this condo, so nice to live in there.

    condo in Philippines

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. It’s really a cool and helpful piece of information. I am glad that you simply shared this useful info with us.
    Please keep us informed like this. Thanks for sharing.

    Chiang mai rentals

    ReplyDelete
  4. Interesting post. A beautiful condo unit at the price you can afford? The Florence in Mckinley Hill is the one, I found it when I am browsing the internet. It's the prepare home for the people who works around the metro.

    ReplyDelete
  5. Thanks for this checklist! A great guide for condo buyer newbies out there! I'm excited to buy my fort bonifacio condo.

    ReplyDelete
  6. A lot of information you have shared in here. Thanks for sharing the guide! It helps a lot especially to those who are looking for a place like this condo.

    ReplyDelete

LinkWithin

Related Posts Plugin for WordPress, Blogger...